Concept of environmental impact assessment system:
Through meticulous process analysis and material accounting, the background monitoring of the surrounding environment and mathematical model prediction, the environmental impact assessment is used to analyze the type, quantity, concentration, the pollution impact range and degree of pollution generated in the process of the project production process, evaluate the pertinence and feasibility of the pollution prevention and control measures to be taken by the project unit, and finally make evaluation conclusions such as the consistency of the industrial policy of the construction project, the rationality of site selection and the controllability of pollutant emissions that meet the standards.
Article 16 of the Environmental Impact Assessment Law of the People's Republic of China shall carry out classified management of the environmental impact assessment of construction projects according to the degree of environmental impact of construction projects
The construction unit shall organize the preparation of environmental impact reports, environmental impact reports or environmental impact registration forms (hereinafter referred to as environmental impact assessment documents) in accordance with the following provisions:
1. If it is possible to cause significant environmental impacts, an environmental impact report should be prepared to conduct a comprehensive evaluation of the resulting environmental impact;
2. If it is likely to cause a mild environmental impact, an environmental impact report form shall be prepared to analyze or specially evaluate the resulting environmental impact;
3. If the environmental impact is very small and there is no need for environmental impact assessment, the environmental impact registration form shall be completed.
Article 3 of the Administrative Measures for Post-environmental Impact Assessment of Construction Projects (Trial), which came into effect on January 1, 2016, stipulates that if the following environmental impact statements do not meet the examination and approval arise during the operation of the following construction projects, post-environmental impact evaluation shall be carried out:
1. Construction projects with large actual environmental impacts and scope in the water conservancy, hydropower, extractive, ports and railway industries, and the main environmental impacts gradually appear after a certain period of completion and operation of the project, and construction projects in other industries that cross important ecologically sensitive areas;
2. Construction projects with major environmental risks in the metallurgical, petrochemical and chemical industries, sensitive construction sites, and continuous emission of heavy metals or persistent organic matter;
3. Other construction projects that the competent administrative department of environmental protection believe should be carried out after environmental impact assessment.
NOA can provide environmental impact assessment technical services and environmental status analysis and detection services.
1. Service background
The Environmental Impact Assessment Act was promulgated and implemented in 2003. It is a law formulated to implement the sustainable development strategy, prevent the adverse impact on the environment after the implementation of planning and construction projects, and promote coordinated economic, social and environmental development. It is a law and regulation that must be observed in the implementation of China's construction projects. It is also a legal document that should be considered and satisfied at the level of environmental protection in the process of investment enterprises, operating enterprises, development and production, which is very important.
2. NOA services
The NOA Environmental Business Department provides professional environmental impact assessment report preparation and submission services for enterprises, and provides full services for the project to be put into production as soon as possible.
1. According to the evaluation object, the environmental impact assessment can be divided into:
(1) Planning environmental impact assessment
(2) Environmental impact assessment of construction projects.
2. According to environmental factors, environmental impact assessment can be divided into:
(1) Atmospheric environmental impact assessment
(2)surface water environmental impact assessment
(3) Acoustic environmental impact assessment
(4) Ecological environmental impact assessment
(5) solid waste environmental impact assessment
3. According to the order, environmental impact assessments are generally divided into:
(1) Evaluation of the current situation of environmental quality
(2) Environmental impact projection evaluation
(3) Post-impact evaluation
3. Service Content
Project category |
Work service content |
Environmental impact assessment |
Prepare environmental advisory reports: judge the types of project environmental assessment (filing registration, report forms, reports) andcomplete the preparation by communicating with the builders and viewing materials. |
Analyze,predict and assess the possible environmental impact after the implementation of the construction project.
|
|
Propose countermeasures and measures to prevent or mitigate adverse environmental impacts. |
|
Assist the client in the environmental assessment and approval work:provide comprehensive professional and technical services for the client throughout the whole process. |
Tel:+86-400 821 5138
Fax:+86-21 3327 5843
Email:noa@noagroup.com