At present, renewable energy utilization technologies such as photovoltaic, wind power, hydrogen energy, biomass and nuclear power have made great progress and formed a certain scale throughout the country. The development and utilization of renewable energy provide new development opportunities for thousands of enterprises, but also bring huge transformation challenges. The grid connection performance acceptance of photovoltaic power station is the first examination of the overall operation performance of the power station after the grid connection of photovoltaic power station. The purpose of acceptance is to verify whether the construction quality of photovoltaic power station and the performance of key components meet the requirements of relevant standards; Make forward rectification suggestions for the problems found in the acceptance process, and provide professional technical consulting services and subsequent re-inspection work to the power station investor, so as to truly eliminate potential dangers and ensure the quality of the power station; The purpose of acceptance is to ensure the quality of the power station, ensure the power generation and service life after the operation of the power station, reduce the risk of power station investment, and ensure the stable income of the photovoltaic power station.
NOA, as a fair and authoritative third-party service agency in the industry with multiple internal and external approvals, has advanced power station testing equipment and a professional technical service team. So far, it has provided nearly 10GW of inspection and testing services for the new energy industry, serving more than 500 customers. Based on GB/T 50796, GB/T 2828, CNCA/CTS 0004, CNCA/CTS 0016, IEC 62446 and other standards, and in accordance with the contract, technical specifications, relevant standards for key equipment, sampling standards and other requirements of relevant parties of photovoltaic power stations, provide photovoltaic power station grid connection acceptance services for large-scale ground centralized photovoltaic power stations, distributed photovoltaic power stations, poverty relief photovoltaic power stations of provincial poverty relief offices and local governments, And issue an accurate third-party acceptance report.
One. Contents of photovoltaic power station grid connection acceptance service provided by NOA
1. Review of basic project information
Power station capacity verification, document review in the early stage of power station project, power station construction stage and power station operation and maintenance stage.
2. Equipment quality and construction quality
Visual inspection of power plant modules, inspection of cables, combiner boxes, inverters, transformers, primary equipment, secondary equipment and other electrical equipment.
3. System performance and safety inspection
EL test of photovoltaic modules in the power station, efficiency test of photovoltaic system, infrared test of photovoltaic modules, module and string IV test, working current test of photovoltaic strings in the combiner box, working voltage test of photovoltaic strings in the combiner box, grounding continuity test, insulation resistance test, inverter conversion efficiency test, inverter power quality test, grounding lightning protection system test, dust shielding loss analysis, photovoltaic array loss analysis PV AC/DC line loss analysis, etc.
Two. Reference Standard
○ GB/T 50796-2012 Code for acceptance of photovoltaic power project
○ GB 50797-2012 Code for design of photovoltaic power station
○ GB 50794-2012 Code for construction of PV power station
○ IEC 62446-1:2016+AMD1:2018 Amendment 1 - Photovoltaic (PV) systems - Requirements for testing, documentation and maintenance - Part 1: Grid connected systems - Documentation, commissioning tests and inspection
○ CNCA/CTS 0004-2010 Basic acceptance requirements for grid-connected PV systems
○ CNCA/CTS 0016-2015 Guideline of Performance Testing and Quality Assessment for Grid-connected PV Power Plants
○ CQC 9102-2012 Technical requirements for evaluation of photovoltaic power generation system
○ CNCA/CTS 0004-2009A Technical Specification of Grid-connected PV inverter
○ GB/T 20513-2006 Photovoltaic system performance monitoring Guidelines for measurement, data exchange and analysis